Perth Amboy Rudyk Park
Publication Year: 2017

Perth Amboy Rudyk Park

Citation:

Alomar, R., D. Nickel, S. Malone, Z. Tech-Czarny, W. Kurzenberger, T. Barracato. 2016. Rudyk Park Community Accessibility and Expansion Project, Final Design Report, prepared for USEPA and the City of Perth Amboy.

For this project, planning and design professionals from the EAC Group, Rutgers Department of Landscape Architecture and Perth’s Amboy’s Office of Economic and Community Development conducted research and analysis of the park, community outreach (which included two community meetings and a door to door survey) as well as prepared a final conceptual design. This report is the final product of the project. It includes a brief history of Rudyk Park, a review of existing conditions, site synthesis, the design development process, information about the community meetings, the final conceptual site design, vignettes and proposed phasing. This report is conceptual, and intended to further the conversation about the design of Rudyk Park and it’s surrounding area.